Port Facility Security Plan (PFSP)

PFSA

In September of this year, we published an article about the Port Facility Security Plan (PFSP). That article explained what drafting a PFSP entails, what it is based on (PFSA), and what the focus is of both the security plan and the underlying risk assessment. In this article, we will discuss the steps taken by the government to guide the process—from risk assessment to the final approval of a PFSP—through the competent authority.

Conducting a risk assessment

Prior to drawing up the PFSP, the government or a Recognized Security Organization (RSO) must conduct a security assessment (EU Regulation 725/2004, Annex II, Articles 15.1 and 15.2). This Port Facility Security Assessment (PFSA) serves, in addition to the explicit requirements set forth in EU Regulation 725/2004, as the basis for drafting the PFSP. During the conduct of the PFSA, all relevant threats are identified and considered, which are then assessed in light of the security measures and procedures that the port facility has already implemented—that is, not merely “planned” but actually in place and in use at that time. Upon completion of the port facility security assessment, a report is prepared (EU Regulation 725/2004, Annex II, Article 15.7) describing, among other things, the vulnerabilities identified and the countermeasures (including procedures) that could be taken with respect to each vulnerability.

Developing a PFSP

Pursuant to EU Regulation 725/2004, Annex II, Article 16.1, a security plan—commonly known as a PFSP (Port Facility Security Plan). The PFSP describes all security measures and procedures established by the port facility to mitigate the risk of an “intentional unlawful act,” defined as (EU Regulation 725/2004, Article 2, paragraph 13)an intentional act which, given its nature or context, could cause harm to ships in international and domestic maritime traffic, to passengers and cargo, and to the port facility in question, to an acceptable level.

  • When drafting the PFSP, the following must be taken into account:
  •  The requirements imposed on the PFSP by the competent authority and, by extension, the regulation; and
  •  The extent to which the proposed measures and procedures align with the recommendations set forth in the PFSA report, and the extent to which they reduce the identified risks to an acceptable level.

Review of the PFSP

Once the PFSP has been drawn up, the port facility submits it to the Port Security Officer (PSO) for review. As prescribed in Article 4c of the Port Security Act (hereinafter: Hbw), the PSO is appointed by the mayor. In this context, the mayor acts in his role as the “Competent Authority for Maritime Security” as referred to in the Port Security Act, Article 2, paragraph 1(a). In this role, the mayor is also referred to as the Port Security Authority (PSA).

When reviewing the PFSP, the assessment examines whether the PFSP meets the requirements set forth in the regulation, whether the measures adequately address the risks identified in the safety assessment, and whether it takes into account the recommendations provided in the PFSA report. If the PFSP is deemed satisfactory, the PSO will advise the mayor, in his role as PSA, to approve the PFSP.

Approval of the PFSP

Upon approval of the PFSP, the mayor issues a port security certificate as referred to in Article 7, paragraph 1, of the Port Security Act. This refers back to the underlying legislation, EU Regulation 725/2004, Annex II, Article 16.2, which states that the PFSP must be approved by the contracting state in whose territory the port facility is located. EU Regulation 725/2004, Annex III, Article 16.6 states that the security measures included in the PFSP must be implemented within a reasonable period of time following the approval of the PFSP, and the PFSP must specify when each measure will be implemented.

Please note that, even though the port facility now has an approved PFSP, this does not mean that ships subject to ISPS requirements may be handled. To this end, all measures and procedures specified in the PFSP must first be implemented. If this is not yet the case, the following provision from Article 16.6 applies, which states that, if delays in implementation are likely, alternative, temporary security measures must be agreed upon that provide a comparable level of security, in order to bridge the interim period.

Withdrawal of consent for the PFSP

Once approved, the provisions of the plan must be complied with. Compliance will be monitored in accordance with Article 5:11 of the General Administrative Law Act (Awb). If, during monitoring, it is found that the port facility is acting in violation of the approved PFSP, the competent authority has various tools at its disposal to take action against this. Initially, the port facility will receive a letter detailing the violation found, and the port facility will be given the opportunity to rectify it. If subsequent inspections reveal that the port facility remains in default, administrative sanctions may be imposed, such as an order subject to administrative coercion, an order subject to a penalty payment, and an administrative fine (Awb, Article 5:2). Finally, there is the possibility of revoking the certificate and, with it, the right to receive ships subject to ISPS requirements. Article 9 of the Hbw states that the mayor is authorized to revoke his approval of the PFSP and the associated port security certificate if it has come to his attention that the operator of the port facility:

  • provided incorrect or incomplete information in the application, and the provision of correct or complete information would have led to a different decision on the application; or
  • Acted in violation of the security policy.

Questions?

Do you have any questions about this article and/or ourport security services? Please don’t hesitate to contact us.

 Per phone: 088-7374700

 Per email

Share this article

Related articles

  • Award Criteria for Security

    Security Award Criteria: Which Criteria Predict How a Contract Will Perform?

    Blog Series: The Request for Proposals—Part 3 An evaluation matrix for a security procurement project that we reviewed last year divided ... read more

    9.3-minute readPublished on: November 3, 2026
  • Security Requirements Specification

    Security Requirements Specification: Procuring Hours or Procuring Results

    Blog Series: The Request for Proposals—Part 2 On the buyer’s desk are three proposals based on the same … read more

    9-minute readPublished on: October 19, 2026
  • srcset="data:image/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27950%27%20height%3D%27260%27%20viewBox%3D%270%200%20950%20260%27%3E%3Crect%20width%3D%27950%27%20height%3D%27260%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E"

    Security Procurement: Rules, Thresholds, and Procedures at a Glance

    Anyone preparing a security procurement bid for a public organization must first determine whether that organization is subject to procurement requirements and ... read more

    9.7-minute readPublished on: October 13, 2026